

Net Zero Policy

Net Zero Heating & Energy Strategy
1. Introduction
Sal’s Care and Support Ltd is committed to achieving net zero carbon emissions by 2030. Heating and energy use account for a significant share of our carbon footprint. This strategy sets out the measures, timelines, and performance indicators for reducing emissions from heating and building energy systems.
2. Objectives
-
Eliminate direct fossil fuel use for heating and hot water by 2028.
-
Reduce total building energy demand by 30% by 2027 compared with the 2023 baseline.
-
Transition to fully renewable electricity supply by 2030.
-
Maintain safe, comfortable, and efficient building conditions for all occupants.
3. Key Actions & Implementation Plan
Action 1: Smart Heating System
-
Description: Install smart heating controls to activate only when indoor temperatures fall below comfort thresholds. Optimize based on occupancy and external temperature.
-
Timeline:
-
Pilot installation: Q1 2025
-
Full rollout: Q3 2025
-
-
KPIs:
-
Heating energy use reduced by 15% by 2026.
-
Real-time monitoring system operational in 100% of zones.
-
Action 2: Comprehensive Insulation Upgrade
-
Description: Retrofit the building with high-performance insulation across walls, roofs, floors, and glazing.
-
Timeline:
-
Audit & insulation survey: Q2 2025
-
Phased installation: Q3 2025 – Q4 2026
-
-
KPIs:
-
Building heat loss reduced by 25% by end of 2026.
-
Energy Performance Certificate (EPC) improved by minimum two rating levels.
-
Action 3: Transition from Gas Boilers to Electric Water Heaters
-
Description: Replace all gas-fired boilers with high-efficiency electric water heaters powered by renewable electricity.
-
Timeline:
-
Procurement & design: Q1 2026
-
Decommissioning of gas systems: Q2 2026 – Q4 2027
-
Full switch to electric: Q1 2028
-
-
KPIs:
-
100% of water heating provided by electric by 2028.
-
Elimination of direct gas use by 2028.
-
Action 4: Renewable Energy Supply & Integration
-
Description: Source 100% renewable electricity through power purchase agreements (PPAs) or on-site generation (solar PV where feasible).
-
Timeline:
-
PPA in place by 2027
-
On-site solar feasibility study by 2025
-
-
KPIs:
-
100% renewable electricity supply by 2030.
-
4. Governance & Monitoring
-
Responsibility: Facilities & Sustainability teams will oversee implementation.
-
Monitoring: Quarterly energy consumption and emissions reporting.
-
Auditing: Independent annual energy audits.
-
Review: Strategy reviewed annually and updated as new technologies emerge.
5. Risks & Mitigation
-
Financial risk: Rising electricity costs → Mitigation: secure long-term renewable PPAs.
-
Technology risk: System underperformance → Mitigation: supplier performance guarantees.
-
Disruption risk: Retrofit works may impact occupants → Mitigation: phased implementation during low-use periods.
6. Expected Outcomes
-
Carbon reductions:
-
50% reduction in heating-related CO₂ emissions by 2027.
-
100% elimination of fossil fuel heating by 2028.
-
-
Operational benefits:
-
Lower long-term energy bills.
-
Increased building value and compliance with net zero regulations.
-
-
Social/environmental benefits:
-
Improved indoor comfort and air quality.
-
Contribution to national and global climate targets.
-
Call: 07563 894022
Email: enquiry@salscareandsupport.co.uk
36-38 Waterside, Hadfield, Glossop, SK13 1BR
Call: 07563 894022
Email: enquiry@salscareandsupport.co.uk
36-38 Waterside, Hadfield, Glossop, SK13 1BR
© Sal’s Care & Support – 2025
© Sal’s Care & Support 2025