Net Zero Policy

Net Zero Heating & Energy Strategy
1. Introduction
Sal’s Care and Support Ltd is committed to achieving net zero carbon emissions by 2030. Heating and energy use account for a significant share of our carbon footprint. This strategy sets out the measures, timelines, and performance indicators for reducing emissions from heating and building energy systems.

2. Objectives
  • Eliminate direct fossil fuel use for heating and hot water by 2028.
  • Reduce total building energy demand by 30% by 2027 compared with the 2023 baseline.
  • Transition to fully renewable electricity supply by 2030.
  • Maintain safe, comfortable, and efficient building conditions for all occupants.

3. Key Actions & Implementation Plan
Action 1: Smart Heating System
  • Description: Install smart heating controls to activate only when indoor temperatures fall below comfort thresholds. Optimize based on occupancy and external temperature.
  • Timeline:
    • Pilot installation: Q1 2025
    • Full rollout: Q3 2025
  • KPIs:
    • Heating energy use reduced by 15% by 2026.
    • Real-time monitoring system operational in 100% of zones.

Action 2: Comprehensive Insulation Upgrade
  • Description: Retrofit the building with high-performance insulation across walls, roofs, floors, and glazing.
  • Timeline:
    • Audit & insulation survey: Q2 2025
    • Phased installation: Q3 2025 – Q4 2026
  • KPIs:
    • Building heat loss reduced by 25% by end of 2026.
    • Energy Performance Certificate (EPC) improved by minimum two rating levels.

Action 3: Transition from Gas Boilers to Electric Water Heaters
  • Description: Replace all gas-fired boilers with high-efficiency electric water heaters powered by renewable electricity.
  • Timeline:
    • Procurement & design: Q1 2026
    • Decommissioning of gas systems: Q2 2026 – Q4 2027
    • Full switch to electric: Q1 2028
  • KPIs:
    • 100% of water heating provided by electric by 2028.
    • Elimination of direct gas use by 2028.

Action 4: Renewable Energy Supply & Integration
  • Description: Source 100% renewable electricity through power purchase agreements (PPAs) or on-site generation (solar PV where feasible).
  • Timeline:
    • PPA in place by 2027
    • On-site solar feasibility study by 2025
  • KPIs:
    • 100% renewable electricity supply by 2030.

4. Governance & Monitoring
  • Responsibility: Facilities & Sustainability teams will oversee implementation.
  • Monitoring: Quarterly energy consumption and emissions reporting.
  • Auditing: Independent annual energy audits.
  • Review: Strategy reviewed annually and updated as new technologies emerge.

5. Risks & Mitigation
  • Financial risk: Rising electricity costs → Mitigation: secure long-term renewable PPAs.
  • Technology risk: System underperformance → Mitigation: supplier performance guarantees.
  • Disruption risk: Retrofit works may impact occupants → Mitigation: phased implementation during low-use periods.

6. Expected Outcomes
  • Carbon reductions:
    • 50% reduction in heating-related CO₂ emissions by 2027.
    • 100% elimination of fossil fuel heating by 2028.
  • Operational benefits:
    • Lower long-term energy bills.
    • Increased building value and compliance with net zero regulations.
  • Social/environmental benefits:
    • Improved indoor comfort and air quality.
    • Contribution to national and global climate targets.

Call: 07563 894022

Email: enquiry@salscareandsupport.co.uk
36-38 Waterside, Hadfield, Glossop, SK13 1BR

Call: 07563 894022

Email: enquiry@salscareandsupport.co.uk
36-38 Waterside, Hadfield, Glossop, SK13 1BR

© Sal’s Care & Support – 2025
© Sal’s Care & Support 2025
Phone
Email
Facebook